Nigeria 180TPH Granite Crushing Project
Design Scheme
Material: Granite
Daily Operation: 10h
Oil Consumption: 1950L per day
Capacity: 180TPH (The yielding is expected to reach 648,000 tons)
Labor Force: 26 workers
Profits: 1500 Naira can be earned by processing a ton of granite.
Project Background
To solve how to put plant into operation quickly and keep stable operation, ZENITH launched the new aggregate production scheme --- lighting mode which can help customers get investments back quickly and make profits. The customer is from Nigeria and bought a standard 750*1060 plant for processing of granite.
Design of Granite Crushing Line
Based on years of experience of cooperation with African customers, ZENITH customized 4 schemes to meet different demands on capacity.
80-120TPH Production Line
Model of Machine | ZSW380*96 | PE600*900 | CSB160 | 2YA1860 |
Quantity (set) | 1 | 1 | 1 | 2 |
Power (KW) | 11 | 75 | 185 | 18.5 |
120-150TPH Production Line
Model of Machine | ZSW420*110 | PE750*1060 | CSB160 | CSB75 | 2YA2160 |
Quantity (set) | 1 | 1 | 1 | 1 | 2 |
Power (KW) | 15 | 90 | 185 | 75 | 22 |
150-200TPH Production Line
Model of Machine | ZSW420*110 | PEW760 | CSB160 | CSD160 | 2YA2160 |
Quantity (set) | 1 | 1 | 1 | 1 | 2 |
Power (KW) | 15 | 10 | 185 | 160 | 22 |
200-250TPH Production Line
Model of Machine | ZSW490*130 | PE900*1200 | CSB240 | CSB160 | 2YA2160 |
Quantity (set) | 1 | 1 | 1 | 1 | 3 |
Power (KW) | 22 | 110 | 240 | 185 | 22 |
Advantages of Granite Crushing Lines
1. The modular design and the optimization layout of electric controlling equipment reduce the costs of cable; the highly automatic central control system reduces costs of human force; the whole optimized design cuts the downtime for maintenance.
2. Harmonious operation among machines. The machines at different stages work coordinately, which maximizes the output of production line.
3. Strong strength of manufacturing guarantees the quality of products. The use of carefully selected materials in key parts makes them anti-abrasive and extends their life expectancy.
4. The lighting mode used in this project ensures quick supply of machines and quick installation so that the customer can get investment costs back in a short time.